Skip to main content

Willkomm Excavating & Grading

(262) 878-0877

Plan Room Plan Room Apply Call (262) 878-0877(262) 878-0877

Main navigation

  • About Us
  • Our Services
  • Projects
  • Employment
  • Contact Us
  • Plan Room
  • Apply

Hoods Creek Attenuation Basin

Caledonia, WI

The Village of Caledonia Water Utility District  and Willkomm Excavating are hard at work constructing a combined 3-million-gallon capacity storm water storage and discharge tank as part of its on-going water conservation efforts.  Willkomm has partnered with Miron Construction to excavate the tanks that are over 20' deep.  With Willkomm's expertise on excavation, high production rates, and commitment to getting the job done the project remains on-schedule despite an extremely wet Wisconsin spring.

Basin Ready to be backfilled in Spring 2023
Excavation Complete
Water trapped in the topsoil after a very wet. spring
laying out the staging area.
The spoil material is not going to waste, instead it will become a new road for the Village.
High production means lots of equipment and many long hours.
Loading haul trucks is the most efficient way to move dirt long distances.
Filling the new road that will be part of a new subdivision.
Ready for concrete
Basin Nearing Completition

Phone: (262) 878-0877
Fax: (262) 878-1337

Footer Logo

17108 County Line Road
Union Grove, WI 53182

© Willkomm Excavating & Grading All Rights Reserved.

Powered By IM